A megawatt where you already have a roof, a feeder and fibre.
A hotel or a multi-site operator holds the three things a first megawatt needs: an existing electrical service, a fibre path and a building that runs around the clock. We match the site to a block, add on-site generation and storage where the feeder is the limit, and replicate across the portfolio on the same standard.
One megawatt per site
A 40-foot container sized to an existing commercial service — an ordinary new-service request to the distribution utility rather than a large-load tariff. Later tranches are planned into the site from day one.
Power where the grid is the bottleneck
Solar and storage behind the meter, a power island where the feeder cannot carry the load, and high-power charging for fleets and guests as part of the same site plan.
Heat has somewhere to go
Hotels use hot water all day. Recovered heat from the block displaces purchased gas — the same return a campus gets, at building scale.
Portfolio, not one-off
Standardised module, control logic and permitting playbook, so the second site executes on adherence rather than renegotiation, with capacity portable across the portfolio.
Tell us about the portfolio
Number of sites, the typical electrical service, whether fibre is in the building, and which entity would sign.